| News Code 68318
Copied

Kuala Lumpur - Singapore High - Speed Rail, Malaysia

Kuala Lumpur - Singapore High - Speed Rail, Malaysia
|
TIN news:    The HSR is expected to become the first high-speed railway in South East Asia, and the fastest point-to-point mode of public transport between the two urban agglomerations.
The line will connect Bandar Malaysia in Kuala Lumpur with Jurong East in Singapore over a length of approximately 350km. It will facilitate seamless travel between the two fast-growing economic engines and reduce travel time to 90min.
The governments of Singapore and Malaysia formally greenlit the project in 2013. Construction is expected to begin in 2017 and be completed by 2022.
Kuala Lumpur-Singapore HSR project details
The HSR line will have a total of seven stops, including the two terminus stations at Bandar Malaysia and Jurong East, and five transit stations at Seremban, Ayer Keroh, Muar, Batu Pahat and Nusajaya. Train services, including a non-stop service from Malaysia to Singapore, are planned to run four times an hour.
The line will include a double-track on standard gauge and will be powered with proven high-speed technologies. Trains on the line are expected to run at a speed of 300km/h. Express service will take a journey time of 90min, while transit service will take 120min on the same route.
The project will be completed in seven years, which includes one-year design and tender phases, as well as a five-year construction phase.
Send Comment