|
News Code
67798
Copied
Opening of Widening of the Panama Canal Confirmed
TIN news: The third set of locks of the Panama Canal will be opened for commercial traffic (Post Panamax) in April 2016, as told by the administrators here.
In the last hours, press reports told about the preparations for the opening, to which 70 Heads of State and Government will be invited, said Panamanian Foreign Vice Minister Miguel Hincapie in a meeting.
At the end of last September, the work presented an overall progress of 94 percent, after concluding the dredging of entries by the Atlantic and Pacific oceans, carrying 92 percent for Gatun Lake and the path known as the Gaillard Cut; achieving 93 percent implementation of the locks, among other critical actions.
The work, considered by experts one of the most complex of its kind in the world, is to facilitate the crossing of ships whose dimensions can carry up to 13,000 TEU (20-foot containers), 2.6 times more than current ships transiting the waterway.
This will operate vessels up to 49 meters wide, 366 meters long and 15 meters depth.
Technological originality of the Panama Canal led him to be among the seven wonders of the world civil engineering, a recognition of the results of those hundred years raised and lowered vessels to or from Lake Gatun.
In the 21st century, when knowledge reaches new levels yesteryear, the locks where cross Post Panamax vessels was used at the beginning of 2016 the same principle of operation created in 1914, with some delicacies and rationality of modern techniques .
The essence of the added elements is on the locks, the places to recycle the water and the crossing of ships with the help of a tug, withoiut the use of locomotives from the earth.
This second variant gives maintenance facilities, and the use of water finds a possibility to save up to 60 percent of the liquid going to the sea, with a complicated set of valves working under the communication vessels.
In the last hours, press reports told about the preparations for the opening, to which 70 Heads of State and Government will be invited, said Panamanian Foreign Vice Minister Miguel Hincapie in a meeting.
At the end of last September, the work presented an overall progress of 94 percent, after concluding the dredging of entries by the Atlantic and Pacific oceans, carrying 92 percent for Gatun Lake and the path known as the Gaillard Cut; achieving 93 percent implementation of the locks, among other critical actions.
The work, considered by experts one of the most complex of its kind in the world, is to facilitate the crossing of ships whose dimensions can carry up to 13,000 TEU (20-foot containers), 2.6 times more than current ships transiting the waterway.
This will operate vessels up to 49 meters wide, 366 meters long and 15 meters depth.
Technological originality of the Panama Canal led him to be among the seven wonders of the world civil engineering, a recognition of the results of those hundred years raised and lowered vessels to or from Lake Gatun.
In the 21st century, when knowledge reaches new levels yesteryear, the locks where cross Post Panamax vessels was used at the beginning of 2016 the same principle of operation created in 1914, with some delicacies and rationality of modern techniques .
The essence of the added elements is on the locks, the places to recycle the water and the crossing of ships with the help of a tug, withoiut the use of locomotives from the earth.
This second variant gives maintenance facilities, and the use of water finds a possibility to save up to 60 percent of the liquid going to the sea, with a complicated set of valves working under the communication vessels.