|
News Code
5265
Copied
Auckland launches electric suburban services
TIN news: Auckland Transport’s first electric trains began revenue operation on April 28, when operating concessionaire Trandev Auckland switched its half-hourly Southern Line service between Britomart and Onehunga from DMUs to EMUs.
The electrification was formally launched by Auckland Mayor Len Brown on April 27 with a ceremony at Britomart attended by Transport Minister Gerry Brownlee and Auckland Transport Chairman Dr Lester Levy. Around 5 000 local residents sampled a limited commemorative shuttle between Britomart and Newmarket.
Auckland Transport says 12 of the 57 three-car EMUs being built by CAF have now been delivered to New Zealand, of which seven are available for service; the remainder are due by the end of next year. As more units are commissioned, Eastern Line services to Manukau are expected to go electric in August, followed by Southern Line services to Pakekura in December and finally the Western Line to Swanson in mid-2015. The EMUs are initially running to the same timings as the DMUs and diesel loco-hauled trainsets that they are replacing, until a timetable change in September starts to exploit their superior performance.
The electrification was formally launched by Auckland Mayor Len Brown on April 27 with a ceremony at Britomart attended by Transport Minister Gerry Brownlee and Auckland Transport Chairman Dr Lester Levy. Around 5 000 local residents sampled a limited commemorative shuttle between Britomart and Newmarket.
Auckland Transport says 12 of the 57 three-car EMUs being built by CAF have now been delivered to New Zealand, of which seven are available for service; the remainder are due by the end of next year. As more units are commissioned, Eastern Line services to Manukau are expected to go electric in August, followed by Southern Line services to Pakekura in December and finally the Western Line to Swanson in mid-2015. The EMUs are initially running to the same timings as the DMUs and diesel loco-hauled trainsets that they are replacing, until a timetable change in September starts to exploit their superior performance.