| Code: 42396 |

 TIN news: Boring of the Czech Republic's longest rail tunnel was ceremonially launched on February 3. The two single-track bores under the Chlum and Homolka hills near Kyšice will be 4 150 m long and are the main feature of the modernisation of the Rokycany – Plzeň section of SŽDC's Corridor 3.
 
The tunnels are being bored using a Type S-799 TBM supplied by Herrenknecht of Germany, which contractor Metrostav says is the largest TBM to be deployed in the Czech Republic.
 
Named Viktorie, the TBM is 114 m long, weighs 1 800 tonnes and has a head diameter of 9·9 m. It allows excavation of up to 15 m of rock per day, starting with the southern bore. The total volume of rock to be excavated is over 600 000 m3.
 
The KC3·9bn project is being carried out by a consortium of Metrostav and Subterra. The EU Cohesion Fund is to meet 76·44% of the cost.
 
Completion is due in mid-2017. Once upgrading of the route for 160 km/h is completed, the journey time between Praha and Plzeň will be reduced to under 1h.

Send Comment

Latest news The most viewed news The most popular topics
Book introduction Magazine introduction Transportation weekly

Multimedia